PSM-I Dumps

PSM-I Free Practice Test

Scrum PSM-I: Professional Scrum Master I

QUESTION 6

When is a Sprint over?

Correct Answer: D
The correct answer is D, because the Scrum Guide states that “a Sprint is a container for all other events. Each event in Scrum is a formal opportunity to inspect and adapt something. These events are specifically designed to enable critical transparency and inspection. Failure to include any of these events results in reduced transparency and is a lost opportunity to inspect and adapt.” Therefore, a Sprint is over when its time-box expires, regardless of whether all Product Backlog items or tasks are completed or not.

QUESTION 7

Which three of the following are feedback loops in Scrum? (Choose three.)

Correct Answer: ACE
The correct answers are A, C, and E, because these are feedback loops in Scrum. The Sprint Review is a feedback loop that allows the Scrum Team and the stakeholders to inspect the Increment and adapt the Product Backlog. The Sprint Retrospective is a feedback loop that allows the Scrum Team to inspect itself and create a plan for improvements. The Daily Scrum is a feedback loop that allows the Development Team to inspect its progress and plan its work for the next 24 hours.

QUESTION 8

A Scrum Master is keeping a list of open impediments, but it is growing and they have been able to resolve only a small portion of the impediments. Which two techniques would be most helpful in this situation? (Choose two.)

Correct Answer: AB
Two techniques that would be most helpful in this situation are to discuss the impediments with the Development Team, and to prioritize the list and work on them in order, as stated in [3]: “The Scrum Master should facilitate a discussion with the Development Team to identify and prioritize the impediments that are blocking their progress. The Scrum Master should then work with the Development Team and other stakeholders to remove or mitigate these impediments as soon as possible.”

QUESTION 9

Five new Scrum Teams have been created to build one product. A few of the developers on one of the Development Teams ask the Scrum Master how to coordinate their work with the order teams. What should the Scrum Master do?

Correct Answer: B
According to the Scrum Guide1, when multiple Scrum Teams are working together on the same product, they must mutually define and comply with the same definition of “Done”, which includes creating an integrated Increment at least by the end of each Sprint. The Scrum Master should teach and coach the Developers that it is their responsibility to work with other Scrum Teams to create an integrated Increment that meets the definition of “Done”. The other options are not aligned with Scrum values and principles.
References: Scrum Guide

QUESTION 10

Who is accountable for clearly expressing Product Backlog items? (Choose the best answer.)

Correct Answer: B
According to the Scrum Guide, the Product Owner is accountable for clearly expressing Product Backlog items, as he or she is responsible for managing and prioritizing the Product Backlog. The other options are not valid, as they imply that the Product Owner can be replaced by a business analyst, or that the Scrum Master or the Developers can express the Product Backlog items.