E20-555 Dumps

E20-555 Free Practice Test

EMC E20-555: Isilon Solutions and Design Specialist Exam for Technology Architects

QUESTION 21

Three jobs are running, all with a priority of 5. A new job with a priority of 6 needs to be run. What happens?

Correct Answer: D

QUESTION 22

A customer experiences a system failure on an Isilon storage node.However, the disk drives in the node are not affected.
What is the preferred method for restoring cluster integrity?

Correct Answer: A

QUESTION 23

You have been working with a customer to size a new Isilon cluster for their environment. You recently determined that a cluster with three X400 nodes with 1TB drives and 48 GB RAM would be a perfect starting point for their workflow, but will have extra capacity. The customer just informed you that they have decided to also use the cluster for a small home directory environment and implement SmartQuotas.
Which configuration changes should you consider?

Correct Answer: A

QUESTION 24

An Isilon has two ports configured per node. Each port is on a different VLAN. Although incoming traffic is evenly distributed, transmitted data from the Isilon uses one port more than the other port. What could be the cause of this imbalance?

Correct Answer: B

QUESTION 25

-- Exhibit -
We have been engaged by a research hospital to help upgrade their Isilon installation. They currently have 12 previous generation Isilon nodes with 200TB of capacity and run on a 1Gbps network. They currently have 6 Illumina Hi-Seq Sequencers and an HPC cluster to process data. They would like to expand Isilon to 2PB of active data and 1PB of archive data. They use a third party data and metadata management service (IRODs) to stage data for analysis. The Isilon cluster is mainly used for analysis work with the HPC cluster.
-- Exhibit -
The customer will add two more Illumina Hi-Seq Sequencers in the next 6 months.
Once these are added, what is the total amount of data from all the sequencers they can expect to add per month?

Correct Answer: A