DCDC-002 Dumps

DCDC-002 Free Practice Test

BICSI DCDC-002: BICSI Data Center Design Consultant - DCDC

QUESTION 26

what is the recommended height, of the support room pathway

Correct Answer: A

QUESTION 27

What is the benefit to locating the power distribution unit supporting equipment outside the computer room

Correct Answer: A

QUESTION 28

CORRECT TEXT
What are the equipment clearance/access requirements when designing the door openings and loading dock areas for a data center?
Solution:
Clearance requirements of 10' L x 4' W x 8' H and 7500 pounds

Does this meet the goal?

Correct Answer: A

QUESTION 29

What are the speed and distance limitations of ESCON?

Correct Answer: C

QUESTION 30

What is the ASHRAE TC 9.9 recommended range for humidity levels in a data center?

Correct Answer: B