- (Exam Topic 11)
Regarding the process described above, what is the most important recommendation you would make using IEEE 1044 as a guide? 2 credits
Correct Answer:
A
- (Exam Topic 13)
Which of the following statements about risks is most accurate?
Correct Answer:
C
In general, project risk and product risk can be hard to differentiate. Anything that impacts on the quality of the delivered system is likely to lead to delays or increased costs as the problem is tackled. Anything causing delays to the project is likely to threaten the delivered system's quality. The risk-based approach is an approach to managing product risk through testing, so it impacts most directly on product risk.
- (Exam Topic 13)
What is the concept of introducing a small change to the program and having theeffects of that change show up in some test..?
Correct Answer:
A
- (Exam Topic 13)
An input field takes the year of birth between 1900 and 2004. The boundary values for testing this field are:
Correct Answer:
C
- (Exam Topic 13)
“How much testing is enough?”
Correct Answer: