- (Topic 7)
Identify THREE items that would be part of the work-breakdown structure showing the key testing activities for the acceptance test project. 2 credits (for 2 out of 3 correct 1 credit)
Correct Answer:
ABD
- (Topic 5)
In addition to risk, identify TWO other components of a testing strategy. 1 credit
Correct Answer:
AC
- (Topic 6)
Which of the following is a benefit of independent testing? 1 credit
Correct Answer:
C
- (Topic 12)
Which of the following statements describes a key principle of software testing?
Correct Answer:
B
- (Topic 12)
Which of the following are the typical defects found by static analysis tools?
Correct Answer:
D