- (Topic 12)
Which option is part of the ‘implementation and execution’ area of the fundamental test process?
Correct Answer:
B
A is part of ‘Analysis and design’.
C is part of ‘Evaluating exit criteria and reporting’.
D is part of ‘Test closure activities’.
- (Topic 12)
A tool that supports traceability, recording of incidents or scheduling of tests is called..?
Correct Answer:
E
- (Topic 12)
Which is not the fundamental test process?
Correct Answer:
D
- (Topic 12)
Which of the following statements BEST describes the difference between testing and debugging?
Correct Answer:
B
- (Topic 12)
When assembling a test team to work on an enhancement to an existing system, which of the following has the highest level of test independence?
Correct Answer:
D
In this scenario, the contract tester who has never worked for the organization before has the highest level of test independence. The three others are less independent as they are likely to make assumptions based on their previous knowledge of the requirements, code and general functionality of the original system.
Note that independence does not necessarily equate to most useful. In practice most test or project managers would recruit a permanent tester who has worked on the original system in preference to a contract tester with no knowledge of the system. However, when assembling a team it would be useful to have staff with varying levels of test independence and system knowledge.