Which of the following terms related to risk management represents the estimated frequency at which a threat is expected to occur?
Correct Answer:
B
The Annualized Rate of Occurrence (ARO) is a number that represents the estimated frequency at which a threat is expected to occur. It is calculated based upon the probability of the event occurring and the number of employees that could make that event occur. Answer D is incorrect. The Exposure Factor (EF) represents the % of assets loss caused by a threat. The EF is required to calculate the Single Loss Expectancy (SLE).
Answer A is incorrect. The Single Loss Expectancy (SLE) is the value in dollars that is assigned to a single event. SLE = Asset Value ($) X Exposure Factor (EF) Answer B is incorrect. Safeguard acts as a countermeasure for reducing the risk associated with a specific threat or a group of threats.
The Information System Security Officer (ISSO) and Information System Security Engineer (ISSE) play the role of a supporter and advisor, respectively. Which of the following statements are true about ISSO and ISSE? Each correct answer represents a complete solution. Choose all that apply.
Correct Answer:
BCD
An Information System Security Officer (ISSO) plays the role of a supporter. The responsibilities of an Information System Security Officer (ISSO) are as follows: Manages the security of the information system that is slated for Certification & Accreditation (C&A). Insures the information systems configuration with the agency's information security policy. Supports the information system owner/information owner for the completion of security-related responsibilities. Takes part in the formal configuration management process. Prepares Certification & Accreditation (C&A) packages. An Information System Security Engineer (ISSE) plays the role of an advisor. The responsibilities of an Information System Security Engineer are as follows:
Provides view on the continuous monitoring of the information system. Provides advice on the impacts of system changes. Takes part in the configuration management process. Takes part in the development activities that are required to implement system changes.
Follows approved system changes.
CORRECT TEXT
Fill in the blank with an appropriate phrase. models address specifications, requirements, design, verification and validation, and maintenance activities.
Correct Answer:
A
A life cycle model helps to provide an insight into the development process and emphasizes on the relationships among the different activities in this process. This model describes a structured approach to the development and adjustment process involved in producing and maintaining systems. The life cycle model addresses specifications, design, requirements, verification and validation, and maintenance activities.
According to U.S. Department of Defense (DoD) Instruction 8500.2, there are eight Information Assurance (IA) areas, and the controls are referred to as IA controls. Which of the following are among the eight areas of IA defined by DoD? Each correct answer represents a complete solution. Choose all that apply.
Correct Answer:
ACD
According to U.S. Department of Defense (DoD) Instruction 8500.2, there are eight Information Assurance (IA) areas, and the controls are referred to as IA controls. Following are the various U.S. Department of Defense information security standards: DC Security Design & Configuration IA Identification and Authentication EC Enclave and Computing Environment EB Enclave Boundary Defense PE Physical and Environmental PR Personnel CO Continuity VI Vulnerability and Incident Management Answer B is incorrect. Business continuity management is an International information security standard.
You are the project manager of the NNN project for your company. You and the project team are working together to plan the risk responses for the project. You feel that the team has successfully completed the risk response planning and now you must initiate what risk process it is. Which of the following risk processes is repeated after the plan risk responses to determine if the overall project risk has been satisfactorily decreased?
Correct Answer:
A
The quantitative risk analysis process is repeated after the plan risk responses to determine if the overall project risk has been satisfactorily decreased. Answer D is incorrect. Qualitative risk analysis is not repeated after the plan risk response process. Answer B is incorrect. Risk identification is an ongoing process that happens throughout the project. Answer C is incorrect. Risk response implementation is not a project management process.