CLSSGB Dumps

CLSSGB Free Practice Test

GAQM CLSSGB: Certified Lean Six Sigma Green Belt (CLSSGB)

QUESTION 1

A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.

Correct Answer: A

QUESTION 2

Which of these is Discrete data?

Correct Answer: C

QUESTION 3

Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).

Correct Answer: CDE

QUESTION 4

When constructing a Fishbone Diagram using the __________ approach is the most classic arrangement.

Correct Answer: A

QUESTION 5

One of the metrics commonly used in Lean Six Sigma is DPU. This acronym stands for __________.

Correct Answer: B