400-007 Dumps

400-007 Free Practice Test

Cisco 400-007: Cisco Certified Design Expert (CCDE v3.0) Written Exam

QUESTION 71

Refer to the table.
400-007 dumps exhibit
A customer investigates connectivity options for a DCI between two production data centers to aid a
large-scale migration project. The migration is estimated to take 20 months to complete but might extend an additional 10 months if issues arise. All connectivity options meet the requirements to migrate workloads. Which transport technology provides the best ROI based on cost and flexibility?

Correct Answer: D

QUESTION 72

Retef to the exhibit.
400-007 dumps exhibit
An engineer is designing a multiarea OSPF network for a client who also has a large EIGRP domain EIGRP routes are getting redistributed into OSPF ,OSPF area 20 has routers with limited memory and CPU resources The engineer wants to block routes from EIGRP 111 from propagating into area 20 and allow EIGRP 222 routes to How in Which OSPF area type fulfills this design requirement?

Correct Answer: C

QUESTION 73

Company XYZ has a new network based on IPv6. Some of the subnets that they are planning to use will be confidential and need an addressing scheme that confines them to the local campus network. Which type of IPv6 addresses can be used for these networks in the IPv6 addressing design?

Correct Answer: D

QUESTION 74

Which management category is not part of FCAPS framework?

Correct Answer: D

QUESTION 75

A senior network designer suggests that you should improve network convergence times by reducing BGP timers between your CE router and the PE router of the service provider. Which two factors should you consider to adjust the timer values? (Choose two.)

Correct Answer: AD