Drag and drop the multicast protocols from the left onto the current design situation on the right.
Solution:
A picture containing table Description automatically generated
Does this meet the goal?
Correct Answer:
A
Which feature must be part of the network design to wait a predetermined amount of time before notifying the routing protocol of a change in the path in the network?
Correct Answer:
B
Refer to the exhibit.
The WAN network of the General Bank of Greece has experienced several outages It takes too long to activate a new branch site The networking department of the bank plans to upgrade the legacy end-of-life WAN network with a new flexible manageable, and scalable in-house solution The number of branches will increase exponentially in the next fiscal year The CTO states that the bank’s mam goal is OPEX reduction The network engineering team prepares a table to evaluate the available options Which WAN technology can be used for the solution?
Correct Answer:
B
Which technology is an open-source infrastructure automation tool that automates repetitive tasks for users who work in networks such as cloud provisioning and intraservice orchestration?
Correct Answer:
A
The Company XYZ network is experiencing attacks against their router. Which type of Control Plane Protection must be used on the router to protect all control plane IP traffic that is destined directly for one of the router interfaces?
Correct Answer:
A